NPDES ID: AR0039837
D — SNC: Discharge monitoring report not received
The facility didn't submit its required discharge monitoring report.
Violations
February 28, 2026
Overflow volume [SS0 volume, CSO volume]
0% over limit
Discharged 0 gal against a permitted limit of 0 gal (MO TOTAL)
DMR, Monitor Only - Overdue
Solids, total suspended
0% over limit
Discharged 0 mg/L against a permitted limit of 135 mg/L (7 DA AVG)
DMR, Limited - Overdue
Overflows
0% over limit
Discharged 0 occur/d against a permitted limit of 0 occur/d (MO TOTAL)
DMR, Monitor Only - Overdue
Coliform, fecal general
0% over limit
Discharged 0 MPN/100mL against a permitted limit of 2000 MPN/100mL (7 DA GEO)
DMR, Limited - Overdue
Flow, in conduit or thru treatment plant
0% over limit
Discharged 0 MGD against a permitted limit of 0 MGD (DAILY MX)
DMR, Monitor Only - Overdue
BOD, 5-day, 20 deg. C
0% over limit
Discharged 0 mg/L against a permitted limit of 45 mg/L (7 DA AVG)
DMR, Limited - Overdue
Oxygen, dissolved [DO]
0% over limit
Discharged 0 mg/L against a permitted limit of 2 mg/L (INST MIN)
DMR, Limited - Overdue
BOD, 5-day, 20 deg. C
0% over limit
Discharged 0 mg/L against a permitted limit of 30 mg/L (MO AVG)
DMR, Limited - Overdue
Flow, in conduit or thru treatment plant
0% over limit
Discharged 0 MGD against a permitted limit of 0 MGD (MO AVG)
DMR, Monitor Only - Overdue
pH
0% over limit
Discharged 0 SU against a permitted limit of 9 SU (MAXIMUM)
DMR, Limited - Overdue
Solids, total suspended
0% over limit
Discharged 0 mg/L against a permitted limit of 90 mg/L (MO AVG)
DMR, Limited - Overdue
Coliform, fecal general
0% over limit
Discharged 0 MPN/100mL against a permitted limit of 1000 MPN/100mL (30DA GEO)
DMR, Limited - Overdue
BOD, 5-day, 20 deg. C
0% over limit
Discharged 0 kg/d against a permitted limit of 10.896 kg/d (MO AVG)
DMR, Limited - Overdue
Solids, total suspended
0% over limit
Discharged 0 kg/d against a permitted limit of 32.73339972 kg/d (MO AVG)
DMR, Limited - Overdue
pH
0% over limit
Discharged 0 SU against a permitted limit of 6 SU (MINIMUM)
DMR, Limited - Overdue
First flagged
April 14, 2026 (3 months ago)
Last confirmed
July 13, 2026 (23 days ago)