A27 CDP LIQUIDS LINE RELEASE REMEDIATION PROJECT

NPDES ID: COG318036

X — SNC: Effluent violation (non-monthly average limit)

The facility discharged more of a pollutant than its permit allows, measured over a period other than a monthly average.

This quarter: 6 effluent violations.

Violations

May 31, 2026

Arsenic, total recoverable

55% over limit

Discharged 0.00171 mg/L against a permitted limit of 0.0011 mg/L (ROLL AVG)

DMR, Limited - Numeric Violation

Manganese, potentially dissolvd

81% over limit

Discharged 0.71300003 mg/L against a permitted limit of 0.39300002 mg/L (ROLL AVG)

DMR, Limited - Numeric Violation

Iron, total recoverable

509% over limit

Discharged 0.91400004 mg/L against a permitted limit of 0.15000001 mg/L (ROLL AVG)

DMR, Limited - Numeric Violation

April 30, 2026

Arsenic, total recoverable

55% over limit

Discharged 0.00171 mg/L against a permitted limit of 0.0011 mg/L (ROLL AVG)

DMR, Limited - Numeric Violation

Manganese, potentially dissolvd

81% over limit

Discharged 0.71300003 mg/L against a permitted limit of 0.39300002 mg/L (ROLL AVG)

DMR, Limited - Numeric Violation

Iron, total recoverable

509% over limit

Discharged 0.91400004 mg/L against a permitted limit of 0.15000001 mg/L (ROLL AVG)

DMR, Limited - Numeric Violation

First flagged

April 14, 2026 (5 months ago)

Last confirmed

July 13, 2026 (2 months ago)