NPDES ID: PRR05J033
D — SNC: Discharge monitoring report not received
The facility didn't submit its required discharge monitoring report.
This quarter: 3 reporting violations.
Violations
March 31, 2026
Nitrite Plus Nitrate Total
0% over limit
Discharged 0 mg/L against a permitted limit of 0.68 mg/L (MAXIMUM)
DMR, Limited - Overdue
Aluminum, total recoverable
0% over limit
Discharged 0 mg/L against a permitted limit of 1.10000005 mg/L (MAXIMUM)
DMR, Limited - Overdue
Zinc, total recoverable
0% over limit
Discharged 0 mg/L against a permitted limit of 0.22700001 mg/L (MAXIMUM)
DMR, Limited - Overdue
September 30, 2025
Aluminum, total recoverable
0% over limit
Discharged 0 mg/L against a permitted limit of 1.10000005 mg/L (MAXIMUM)
DMR, Limited - Overdue
March 31, 2025
Aluminum, total recoverable
0% over limit
Discharged 0 mg/L against a permitted limit of 1.10000005 mg/L (MAXIMUM)
DMR, Limited - Overdue
Zinc, total recoverable
0% over limit
Discharged 0 mg/L against a permitted limit of 0.22700001 mg/L (MAXIMUM)
DMR, Limited - Overdue
Nitrite Plus Nitrate Total
0% over limit
Discharged 0 mg/L against a permitted limit of 0.68 mg/L (MAXIMUM)
DMR, Limited - Overdue
December 31, 2024
Zinc, total recoverable
0% over limit
Discharged 0 mg/L against a permitted limit of 0.22700001 mg/L (MAXIMUM)
DMR, Limited - Overdue
Aluminum, total recoverable
0% over limit
Discharged 0 mg/L against a permitted limit of 1.10000005 mg/L (MAXIMUM)
DMR, Limited - Overdue
Nitrite Plus Nitrate Total
0% over limit
Discharged 0 mg/L against a permitted limit of 0.68 mg/L (MAXIMUM)
DMR, Limited - Overdue
First flagged
April 14, 2026 (3 months ago)
Last confirmed
July 13, 2026 (24 days ago)